AC Calibration Tank/AC Meter System

Tank (top) calibrates the liquid asphalt metering system (bottom) of a drum mix plant. Vertical or horizontal styles, each with a capacity of 1,000 gallons, are available. Tank is mounted on load cells that have an LED scale indicator. The jacketed asphalt line on the tank is heated with the hot oil provided by the thermal fluid heater used to heat other plant components. The tank is not insulated, as it is not used for asphalt storage. AC meter system available in pump pushing pump and mass flow styles.

This page was last updated on Fri Dec 2, 2005.

Please contact CEI Enterprises (CEI) at
Phone (505) 842-5556 | Toll-Free (800) 545-4034 | Fax: (505) 243-1422
245 Woodward Road, SE | Albuquerque, NM 87102

© 2001-2005 Astec Industries, Inc. All Rights Reserved. Legal Notice | Privacy Policy | Webmaster | Site Map

Related Sections
RAP King Counter-Flow Drum Mixer

Jacketed Firebox Heater

Boosters Heaters

Heavy Fuel Pre-Heater

Vertical AC Tank

Portable AC Tank

Horizontal AC Tank

Electrically Heated Tank

Double-Wall Fuel Oil Tanks

Fuel Tank

Asphalt Rubber Reaction Tank

Water Tank

Asphalt Rubber Blending System

AC Calibration Tank/AC Meter System

The Nomad(TM) HMA Plant

Liquid Additive Systems